Two ways an opening leaks
A door or a window is a deliberate hole in an envelope that is otherwise meant to hold. It can be forced, and — in rooms that process sensitive information — it can radiate. The two problems are governed by different standards, and both are routinely misread.
The number is not minutes of endurance
The most common misreading of a resistance class is that it states how long a window holds out. It does not. Under EN 1627 a class is defined by three things at once: the set of tools the tester is allowed to use, the resistance time — the period of effective working time during which the specimen must not be breached — and the maximum test time, which includes preparation, tool changes and pauses.
Those last two get conflated constantly, and the gap between them is wide. Quoting the maximum test time as if it were resistance time inflates a class by a factor of three.
| Class | Tool set | Resistance time | Max. test time |
|---|---|---|---|
| RC1 / RC1 N | A1 | no manual attack test | — |
| RC2 / RC2 N | A2 | 3 min | 15 min |
| RC3 | A3 | 5 min | 20 min |
| RC4 | A4 | 10 min | 30 min |
| RC5 | A5 | 15 min | 40 min |
| RC6 | A6 | 20 min | 50 min |
The letter N after a class means that no resistance class is required of the glazing. RC2 and RC2 N are not the same product, and neither are RC1 and RC1 N. The number is the headline; the letter is the condition attached to it.
Each class adds tools, not just time
This is why the resistance times look short. The tester is not repeating the same attack for longer — at each step they are handed more capability. The sets accumulate: everything available at RC2 is still available at RC6.
A rotating drilling tool first appears at RC3, not earlier, because the cylinders required below that class are already drill-resistant. Mains-powered tools — including an angle grinder with a disc up to 125 mm — first appear at RC5. A 230 mm disc and a demolition hammer belong to RC6. Hand tools never drop out: a crowbar, correctly applied by an experienced tester, develops a force at the fulcrum that no power tool matches, and it keeps doing destructive work at the top of the scale.
The standard itself identifies this as its widest step. Below it sits the opportunist working with what fits in a pocket; above it, an attacker who arrived with a plan and the tools to carry it out. It is the single most consequential decision in a specification, and it is usually made by someone reading a product sheet rather than the standard.
We build steel and aluminium windows and doors across this range; the aluminium windows in class RC4 sit exactly at that step.
The class belongs to the assembly, not to the leaf
A resistance class is awarded to a tested configuration — leaf, frame, glazing, hardware, cylinder and the way it is fixed into the structure. Change one of those and the class does not travel with the remainder. EN 1627 makes this explicit by attaching minimum requirements to the components themselves:
| Class | Glazing (EN 356) | Cylinder (EN 1303, digit 7) | Static load F3 |
|---|---|---|---|
| RC1 | P2A | class 4 | 3 kN |
| RC1 N | not required | class 4 | 3 kN |
| RC2 | P4A | class 4 | 3 kN |
| RC2 N | not required | class 4 | 3 kN |
| RC3 | P5A | class 4 | 6 kN |
| RC4 | P6B | class 6 | 10 kN |
| RC5 | P7B | class 6 | 15 kN |
| RC6 | P8B | class 6 | 15 kN |
The second leak: emission, not intrusion
Burglary resistance is only one of the things an opening can fail at. A room built to contain electromagnetic emissions behaves as a shielded enclosure, and the attenuation of that enclosure is only as good as its weakest aperture. Every penetration — cable entry, ventilation duct, door, window — is a candidate leakage path. The physics is indifferent to intent: the same aperture that lets a signal out lets interference in.
This is where physical security and information security genuinely meet, and the meeting point is narrower and less glamorous than the usual telling. It is not about sensors, encryption keys or smart buildings. It is about whether the frame, the glazing and the joint between them preserve the attenuation of the wall they interrupt, while still opening, closing, sealing and carrying whatever other class the room requires.
That combination is the hard part. A shielded opening has to be a window as well — it has to meet the thermal, acoustic and, frequently, the burglary or fire requirements that apply to the rest of the façade, without the shielding being compromised by the hardware that makes it operable. Our work on electromagnetically shielded windows addresses exactly that intersection.
What to take from this
If a specification quotes a resistance class as a number of minutes, it has already lost the thread. Ask for the class with its suffix, the glazing class, the cylinder class, and confirmation that the configuration offered is the configuration that was tested. Those four questions separate a product that holds its class from one that merely cites it.